Skip to main content

We look forward to safely welcoming you. Please visit this page before planning your trip and contact each business directly to check their hours and offerings.

Baker Brook No. 2 Covered Bridge

Built in 1939, this covered bridge is 29 m (95 ft.) in length. Driving directions: Route 2, Exit 18, Hébert Boulevard/Route 120 South, 23.4 km (14.5 mi.) onto Cyr Street.

(Not in service)

Photos
Back to Top