Skip to main content

Travel Advisory: Due to an extreme wildfire risk, forest activities are paused in New Brunswick. Stay up to date on current conditions and closures by visiting the Fire Watch information page.

Nackawic River No. 5 Covered Bridge (Nackawic Siding)

Built in 1927, this covered bridge is 18 m (60 ft.) in length. Driving directions: Route 2, Exit 185, Route 550 East 3.9 km (2.4 mi.), Route 103 North 2 km (1.2 mi.), Route 585 East 26.8 km (16.6 mi.), on Nackawic Siding Road - seasonal road - 3 km (2 mi.), near Millville.